Home My Page Projects GeCoS
Summary Activity Forums Tracker Lists Tasks Docs News SCM Files

Browse tasks

Displaying results 1-25 out of 26 total.

Assignee:
Status:
Category:
Sort On:
Detail View:
Task Id Task Summary Start Date End Date Percent Complete
3797 Dotty output for Model IR 2009-11-10 13:00   2009-11-25 13:00 100%
3798 FindNextASTBasicBlock control flow builder 2009-11-25 13:00   2009-12-03 13:00 100%
3799 Basic Blocks control flow fixer 2009-11-10 13:00   2009-11-17 13:00 100%
3800 TOM/GOM bindings fro EMF-CDFG 2009-12-01 14:00   2009-12-15 14:00 100%
3801 FADALIB bindings V1 2010-01-01 14:00   2010-07-15 14:00 100%
3807 Procedure inliner transform 2009-11-24 10:00   2009-12-11 10:00 95%
3808 Fixing the ForUnroller transform 2009-11-24 10:00   2009-12-11 10:00 75%
3809 CDFG IR generation from CLOOG IR 2010-01-02 10:00   2010-01-31 10:00 100%
3810 EMF Model for System of Affine Recurrennt Equation 2010-01-15 10:00   2010-08-15 10:00 100%
3811 Fixing CRegenerator to support AC_INT/AC_FIXED types 2009-11-24 10:00   2009-11-30 10:00 100%
3812 Check that CRegenerator works on STMicro benchmarks 2009-11-24 10:00   2009-12-15 10:00 100%
3813 Complete and document CDFG factories 2009-11-24 12:00 * 2009-01-15 12:00 10%
3814 Polyedral Reduced Depedance Graph Dotty export 2010-02-24 12:00 * 2010-03-15 12:00 0%
3815 SCOP analyser on the CDFG 2010-02-15 12:00   2010-03-15 12:00 100%
3816 Setup testing flow for GCC torture tests 2009-11-25 08:00   2009-12-02 08:00 100%
3835 Adapt CallGraphbuilder to Gecos project 2009-11-26 13:00   2009-12-03 13:00 100%
3916 Add a GCC checker pass for GecosProject 2010-01-15 11:00 * 2010-01-22 11:00 0%
3917 Improve #include support for S2S 2010-01-15 11:00 * 2010-01-22 11:00 0%
3946 Metamodel for dataflow anlysis 2010-02-02 15:00   2010-02-09 15:00 100%
4350 Automaticcaly detecting "pure functions" 2010-07-13 11:00 * 2010-07-20 11:00 0%
4411 Building domain (bounds) of output array 2010-10-11 10:00 * 2010-10-15 10:00 0%
4412 Applying the Tiling on Stereo_bp algorithm 2010-10-11 10:00 * 2010-10-22 10:00 0%
4413 Implement Fautrier multi-dim scheduling on PolyhedralIR 2010-10-13 07:00 * 2010-10-20 07:00 0%
4414 Implement the array layout transformations 2010-10-13 07:00 * 2010-10-20 07:00 0%
4415 Bind the BEE array constraction engine with Gecos 2010-10-13 07:00 * 2010-10-20 07:00 0%
1  2  next →
* Denotes overdue tasks

Priority Colors: 1 2 3 4 5